Monday, June 7, 2010

Bright Up Our Life.

This is all lighting that we bought from lightings.com.sg. What my wife wanna to get is philips light bulb with remote control cost $109. She put that on her wish list so when house warming someone will buy for her. LOL... Anyway her youngest sister said will buy for her as our new house gift.

3 Milo tin for storeroom & 2 bathroom
2nd & 3rd bedroom
Bar top hanging light
MBR in front of wardrobe
Kitchen
Downlight
My wife favourite hanging light for MBR

Plastering, Wiring, Fall Ceiling & Air-con Installed

OMG... Sorry that I took so long to update my house renovation photos. I'll only upload the photos until I'm free to tell you more about what had happened in between the renovation.

After plastering it look so nice.





Messy wiring
My DAIKIN non-inverter system 4

Thursday, May 13, 2010

Reno Reno...

The following next 2 week will have more thing done. City gas heater on 17th May, 21st May air-con, 24th May laminate flooring, wiring and plastering. Can't wait can't wait... Can't wait to see more job done. Is also mean that I going to get my house key and move in.

Tiling work going to start soon.

All tiles had been hacked and removed. UGLY~!
MBR bathroom wall & floor tiles done. Left mosaic...

See left hand side is a newly built storeroom.
Common bathroom really feel like those resort outdoor bathroom.

New straighten door frame up.

Entrance and changing shoe area.
MBR bathroom

Can you see the mosaic are so uneven and slanted. Really poor tiling work and skill.
For this window grilles I don't mind they send to my place early. But at least you need to wrap it up and look for a safety area to put. Never wrap and just put like rubbish. What the hell they're doing...

MBR casement window up.
2nd bedroom casement window up.

Sunday, May 2, 2010

Renovation START~!

Our LOVE NEST renovation started on 26th April 2010. For the first week, they only worked for 3 days. I think my ID have many big project on hand so he was short of manpower to work for my house. Below photos are the 1st week renovation progress. Yesterday received his renovation work schedule. Renovation will only complete and hand over to me on 21th June 2010.

Actually I don't mind he spend about 2 months to complete my house renovation. I just worried he only send his guys for my house renovation 3~4 days a week. When they have not enough of time to complete they just anyhow do and hand over my LOVE NEST to me. I'll really get mad and don't pay him the last 10% payment. If I not satisfy I will really do that. Just hopefully everything nicely done and whole progress are smooth.

3D drawing from my ID - Kitchen
Photobucket

3D drawing from my ID - View from entrance
Photobucket

3D drawing from my ID - Bar counter side view
Photobucket

3D drawing from my ID - Common bathroom (Resort feel)
Photobucket

3D drawing from my ID - MBR bathroom (Modern feel)
Photobucket

Renovation START... =)
Photobucket

Photobucket

Photobucket

Photobucket

Photobucket

Photobucket

Photobucket

Photobucket

Photobucket

Photobucket

Photobucket

Photobucket

Photobucket

Photobucket

Photobucket

Photobucket

Photobucket

Photobucket

Photobucket

Photobucket

Photobucket